Items Completed by Conestoga Log Cabins
  • Main flooring
  • Loft flooring
    (when applicable)
  • Log walls
  • Stud walls
  • Siding on interior stud walls
  • Stairs or ladders
  • Railings and banisters
  • Porch rails
  • Porch deck boards
  • Rough in electrical wiring to back of cabin
  • Finish electric (outlets, light fixtures, smoke detector[s], face plates)
  • Hang interior and exterior doors
  • Install windows
  • Interior and exterior door trim
  • Interior and exterior window trim
  • Roof boards
  • Floor and ceiling insulation (when applicable)
  • Metal roofing
  • Roof trim boards
  • Accessories supplied by Conestoga (optional)
Owner Supplied Labor and/or Materials
  • Foundations
  • Exterior stairs
  • All furniture and equipment not purchased through Conestoga
  • All plumbing (kitchen and bathroom[s])
  • All other trim not associated with windows and doors
  • Electrical connection to a breaker box and main power supply
  • Surface preparations including sanding, staining and painting
  • Perforations through the roofing
  • Debris and trash removal
  • Off loading delivery truck(s)
  • Any other modifications to original contracted building work unless authorized in writing by Conestoga